Interior Design & Cabinetry · Ipoh
Free site measure and 3D rendering, then the same team builds and installs it.
Every Wednesday you get progress photos — which matters more, not less, when you are not on site.
We serve all of Peninsular Malaysia. East Malaysia projects are welcome to inquire — subject to full-container board volume.
Straight answer first
Our workshop is in Puchong, roughly a two-and-a-half-hour drive from Ipoh — the closest of the out-of-town cities we serve apart from Melaka. We do not have an Ipoh branch, showroom or local team.
The site measure is a scheduled trip. Everything after it — 3D rendering, quotation, material choices — is handled remotely, and the Wednesday progress photos mean you are not relying on someone telling you it is nearly done.
Ipoh work tends to be houses rather than high-rise units. No renovation permit from a management office, no service lift booking, no permitted working hours set by someone else. That removes the single most common reason a start date slips — but it also means our three months is counted from the day work can actually begin on your side.
Many Ipoh homes are decades old. Walls are not always square, and existing built-in carpentry can be sitting on moisture or termite damage that only shows when it comes out. We would rather find that at the site measure than at installation, so expect the measure here to take longer than it would in a new condo.
Landed homes here commonly run a wet and dry kitchen split, and the kitchen footprint is larger than a condo galley. That changes the brief more than most people expect — layout and storage planning matter more, and the quotation should be itemised line by line so you can see where the money actually goes.
If you are renovating a family house or a property you are not living in, you may not be there to check on anything. That is the situation the weekly photos exist for — you should not have to drive up from KL to find out whether this week happened.
Before work starts
We read through what Malaysian homeowners say publicly about their renovations. Very few complain about materials. Almost all of it comes down to the same four things —
01
Three months was the promise; six months in, they are still "wrapping up" — the single most common complaint we found.
02
Every question answered before signing; messages ignored and calls unanswered after work starts — the second most common.
03
You cannot see the site, so all you have is someone saying "almost done".
04
The part they got wrong, and the homeowner is asked to pay again to fix it.
How we work
"Dedicated", "professional", "on time" — every company writes those. Below are four you can actually hold us to.
Promise 01
Site photos + what was done this week + what happens next week, straight to your WhatsApp.
You should not have to become the project manager of your own home.
Promise 02
Three months from the day you have the keys and management approves works to begin. Public holidays, weekends, and time spent on your own design changes are not counted.
Anyone can say "guaranteed on time". We put the counting method in writing.
Promise 03
Delamination, cracking, moisture blistering — we replace the board or refund what that board cost. The warranty covers the board itself; it does not cover labour, installation or transport.
We write down what is not covered too. That is how you know the warranty is real.
Promise 04
Installation is supervised on site by our own technicians brought in from China. Trades like wiring and ceiling work go to specialist subcontractors, as is standard in the industry — but one team runs the project from start to finish.
If something goes wrong, there is nobody else for us to point at.
About the board
ENF grade across the entire range (formaldehyde emission ≤ 0.025 mg/m³ — the highest grade under GB/T 39600-2021).
Not a paid upgrade. It is the standard specification. Third-party test report JC26-WT0087 measured 0.022 mg/m³. If you have young children or someone expecting at home, this is not something you have to pay extra to get.
Wood itself releases trace formaldehyde, so we only talk in grades and numbers, never absolutes — and this number is one you can take to any other supplier and compare.

Process
01
Your floor plan, how many rooms, when you want to move in, rough budget.
02
We measure every space on site. No charge.
03
See what it will look like before you commit. No charge.
04
Itemised line by line. We only sign after you have confirmed it.
05
Cabinets are cut and assembled to your measurements.
06
Our technicians supervise on site, then we walk the handover with you.

Questions homeowners ask
Straight talk
Anything else, we are glad to talk — and even if you do not end up choosing us, the site measure and the 3D are still free.
Further reading
Also from JIYU
Next step
Answer these four and our first reply can get straight to the point, instead of starting from "how big is your unit?".