JIYUJIYU
中文

Interior Design · Peninsular Malaysia

Interior design that
actually gets built —
handover in three months.

Free site measure and 3D rendering, then the same team builds and installs it.Every Wednesday you get progress photos, so you never have to chase anyone.

We serve all of Peninsular Malaysia. East Malaysia projects are welcome to inquire — subject to full-container board volume.

Before work starts

What worries you is not how the board looks

We read through what Malaysian homeowners say publicly about their renovations. Very few complain about materials. Almost all of it comes down to the same four things —

01

Will this ever actually finish?

Three months was the promise; six months in, they are still "wrapping up" — the single most common complaint we found.

02

Once they have my money, can I still reach them?

Every question answered before signing; messages ignored and calls unanswered after work starts — the second most common.

03

I have paid — does the progress actually match?

You cannot see the site, so all you have is someone saying "almost done".

04

When something goes wrong, who owns it?

The part they got wrong, and the homeowner is asked to pay again to fix it.

How we work

Four things we are willing to put in writing

"Dedicated", "professional", "on time" — every company writes those. Below are four you can actually hold us to.

Promise 01

Every Wednesday, we send you the progress — you never have to ask

Site photos + what was done this week + what happens next week, straight to your WhatsApp.

You should not have to become the project manager of your own home.

Promise 02

Three-month handover — and we write down which day the clock starts

Three months from the day you have the keys and management approves works to begin. Public holidays, weekends, and time spent on your own design changes are not counted.

Anyone can say "guaranteed on time". We put the counting method in writing.

Promise 03

10-year board warranty, in writing

Delamination, cracking, moisture blistering — we replace the board or refund what that board cost. The warranty covers the board itself; it does not cover labour, installation or transport.

We write down what is not covered too. That is how you know the warranty is real.

Promise 04

One team is accountable from first measure to handover

Installation is supervised on site by our own technicians brought in from China. Trades like wiring and ceiling work go to specialist subcontractors, as is standard in the industry — but one team runs the project from start to finish.

If something goes wrong, there is nobody else for us to point at.

About the board

Every cabinet is built on ENF-grade board

ENF grade across the entire range (formaldehyde emission ≤ 0.025 mg/m³ — the highest grade under GB/T 39600-2021).

Not a paid upgrade. It is the standard specification. Third-party test report JC26-WT0087 measured 0.022 mg/m³. If you have young children or someone expecting at home, this is not something you have to pay extra to get.

Wood itself releases trace formaldehyde, so we only talk in grades and numbers, never absolutes — and this number is one you can take to any other supplier and compare.

  • ·9 / 11-ply symmetric cross-grain core
  • ·Moisture resistant
  • ·Termite resistant
  • ·Strong screw holding
  • ·Stable under load
  • ·Flat surface, resists warping
JIYU ENF-grade multi-ply board

Process

From first message to moving in, six steps

01

Tell us what you need

Your floor plan, how many rooms, when you want to move in, rough budget.

02

Free site measure

We measure every space on site. No charge.

03

3D rendering

See what it will look like before you commit. No charge.

04

Confirm the quote

Itemised line by line. We only sign after you have confirmed it.

05

Production

Cabinets are cut and assembled to your measurements.

06

Install and hand over

Our technicians supervise on site, then we walk the handover with you.

JIYU process — board selection, 3D design, cutting, assembly and installation

Questions homeowners ask

Interior design in Malaysia — the five we get asked most

Do you only do the design, or do you build it too?
Both. The site measure and 3D rendering are free, and the same team then builds the cabinetry and installs it. You are not handing a drawing to a separate contractor and hoping they match.
Which parts of Malaysia do you cover?
All of Peninsular Malaysia — Kuala Lumpur, Selangor, Penang, Johor, Perak, Melaka and the rest. East Malaysia projects are welcome to inquire, subject to full-container board volume.
How long does it take?
Three months from the day you have the keys and building management approves works to begin. Public holidays, weekends, and time spent on your own design changes are not counted — we write the counting method into the contract.
What board do you use?
ENF grade across the entire range — formaldehyde emission ≤ 0.025 mg/m³, the highest grade under GB/T 39600-2021. It is the standard specification, not a paid upgrade. Third-party test report JC26-WT0087 measured 0.022 mg/m³.
Is the 3D rendering really free?
Yes, along with the site measure. It is for homeowners seriously considering us — if you only want a free rendering to shop around with, we would rather say so upfront.

Straight talk

Three cases where you should not come to us

  • You just want whoever quotes cheapest — we do not compete on price, and we will not cut to a number we cannot deliver on.
  • You only want a free 3D rendering to shop around with — the 3D is for homeowners seriously considering us.
  • You need to move in within a month — we cannot do that, and it is better to say so now than to say yes and drag you along.

Anything else, we are glad to talk — and even if you do not end up choosing us, the site measure and the 3D are still free.

Next step

Leave your details and we will reach out

Answer these four and our first reply can get straight to the point, instead of starting from "how big is your unit?".