JIYUJIYU
中文

Interior Design & Cabinetry · Johor Bahru

Interior design for Johor Bahru homes —
handover in three months.

Free site measure and 3D rendering, then the same team builds and installs it.Every Wednesday you get progress photos — which matters more, not less, when you are not on site.

We serve all of Peninsular Malaysia. East Malaysia projects are welcome to inquire — subject to full-container board volume.

Or leave your details and we will reach out ↓

Straight answer first

We are not based in Johor Bahru — here is exactly how that works

Our workshop is in Puchong, roughly a four-hour drive from Johor Bahru. There is no JB branch, no JB showroom and no local team — we would rather you know that on the first page than find out on the first call.

The site measure is a scheduled trip we book with you. After that, the 3D rendering, the quotation and the material choices all happen without you needing to be in the same room, let alone the same state.

If what you want is someone you can call at 8pm to come look at something tomorrow morning, a local contractor will serve you better, and that is a fair reason to pick one.

What is actually different about renovating in Johor Bahru

A lot of JB owners are not in JB

Working across the causeway, based in Singapore, or holding the unit as an investment — plenty of owners here cannot drop by on a Saturday to see how it is going. If that is you, the weekly progress photos are not a nice extra; they are the only thing standing between you and taking someone’s word for it.

Tell us your travel pattern before we schedule anything

If you can only be at the unit on weekends or public holidays, say so up front. The site measure and the handover walk are the two steps where you being there genuinely matters, and they are much easier to book around your calendar than to reschedule after the fact.

Currency does not change what the board is

If you earn in a stronger currency, a quotation here can look inexpensive in a way that stops you asking the questions you would ask at home. Ask for the formaldehyde grade, the test report number and what the warranty excludes — the same three things we would want you to ask any supplier, in any currency.

High-rise rules still set your start date

JB condominiums run the same permit, service lift and working-hours system as the Klang Valley. Our three months is counted from the day management approves works — not the day you sign — and that counting method goes in writing before you sign.

Before work starts

What worries you is not how the board looks

We read through what Malaysian homeowners say publicly about their renovations. Very few complain about materials. Almost all of it comes down to the same four things —

01

Will this ever actually finish?

Three months was the promise; six months in, they are still "wrapping up" — the single most common complaint we found.

02

Once they have my money, can I still reach them?

Every question answered before signing; messages ignored and calls unanswered after work starts — the second most common.

03

I have paid — does the progress actually match?

You cannot see the site, so all you have is someone saying "almost done".

04

When something goes wrong, who owns it?

The part they got wrong, and the homeowner is asked to pay again to fix it.

How we work

Four things we are willing to put in writing

"Dedicated", "professional", "on time" — every company writes those. Below are four you can actually hold us to.

Promise 01

Every Wednesday, we send you the progress — you never have to ask

Site photos + what was done this week + what happens next week, straight to your WhatsApp.

You should not have to become the project manager of your own home.

Promise 02

Three-month handover — and we write down which day the clock starts

Three months from the day you have the keys and management approves works to begin. Public holidays, weekends, and time spent on your own design changes are not counted.

Anyone can say "guaranteed on time". We put the counting method in writing.

Promise 03

10-year board warranty, in writing

Delamination, cracking, moisture blistering — we replace the board or refund what that board cost. The warranty covers the board itself; it does not cover labour, installation or transport.

We write down what is not covered too. That is how you know the warranty is real.

Promise 04

One team is accountable from first measure to handover

Installation is supervised on site by our own technicians brought in from China. Trades like wiring and ceiling work go to specialist subcontractors, as is standard in the industry — but one team runs the project from start to finish.

If something goes wrong, there is nobody else for us to point at.

About the board

Every cabinet is built on ENF-grade board

ENF grade across the entire range (formaldehyde emission ≤ 0.025 mg/m³ — the highest grade under GB/T 39600-2021).

Not a paid upgrade. It is the standard specification. Third-party test report JC26-WT0087 measured 0.022 mg/m³. If you have young children or someone expecting at home, this is not something you have to pay extra to get.

Wood itself releases trace formaldehyde, so we only talk in grades and numbers, never absolutes — and this number is one you can take to any other supplier and compare.

  • ·9 / 11-ply symmetric cross-grain core
  • ·Moisture resistant
  • ·Termite resistant
  • ·Strong screw holding
  • ·Stable under load
  • ·Flat surface, resists warping
JIYU ENF-grade multi-ply board

Process

From first message to moving in, six steps

01

Tell us what you need

Your floor plan, how many rooms, when you want to move in, rough budget.

02

Free site measure

We measure every space on site. No charge.

03

3D rendering

See what it will look like before you commit. No charge.

04

Confirm the quote

Itemised line by line. We only sign after you have confirmed it.

05

Production

Cabinets are cut and assembled to your measurements.

06

Install and hand over

Our technicians supervise on site, then we walk the handover with you.

JIYU process — board selection, 3D design, cutting, assembly and installation

Questions homeowners ask

Johor Bahru homeowners ask us these first

I work in Singapore and cannot be on site. How do I know what is actually happening?
Every Wednesday you get site photos, what was done that week and what happens next week, sent to your WhatsApp without you having to ask. For owners who are not in the country most weeks, that is the whole point of the promise.
Do you actually come down to JB for the site measure?
Yes — it is a scheduled trip from our Puchong base. We book a date with you rather than promising to drop in. We do not have a JB branch or showroom.
Can we do the site measure and handover on a weekend?
Tell us your travel pattern before we schedule. Those two steps are the ones where being there matters, so it is far easier to plan them around your weekends up front than to move them later.
What grade of board do you use?
ENF grade across the entire range — formaldehyde emission ≤ 0.025 mg/m³, the highest grade under GB/T 39600-2021. It is our standard specification, not a paid upgrade. Third-party test report JC26-WT0087 measured 0.022 mg/m³.

Straight talk

Three cases where you should not come to us

  • You just want whoever quotes cheapest — we do not compete on price, and we will not cut to a number we cannot deliver on.
  • You only want a free 3D rendering to shop around with — the 3D is for homeowners seriously considering us.
  • You need to move in within a month — we cannot do that, and it is better to say so now than to say yes and drag you along.

Anything else, we are glad to talk — and even if you do not end up choosing us, the site measure and the 3D are still free.

Next step

Leave your details and we will reach out

Answer these four and our first reply can get straight to the point, instead of starting from "how big is your unit?".